Nuckulla Hill Gold Project

Large-scale potential along strike from Tunkillia 

Auravelle’s 100%-owned Nuckulla Hill Gold Project is located 40km south of Barton Gold’s 1.6Moz Tunkillia Gold Project in South Australia’s Gawler Craton, and centred around the crustal-scale Yarlbrinda shear zone. The project has seen minimal active exploration since the 1990’s.

Nuckulla Hill hosts a series of advanced gold targets including: 

  • Sheoak: 800m strike length, open north, south and at depth, with multiple high-grade hits.
  • Bimba: 300m strike length, mineralised to at least 120m depth.
  • Myall: Shows strong mineralisation with only limited drilling.

Auravelle is aiming to extend known mineralisation both along strike and at depth with aggressive follow-up drilling as well as finding new deposits.

Project Details

  • Located 10km south-west of Lake Everard and ~500km north-west of Adelaide in South Australia.
  • Comprises one granted Exploration Licence (EL 6288) and covers an area of 465km2 in South Australia’s central Gawler Craton.
  • Lies 40km south of Barton Gold’s Tunkillia Gold Project, which hosts a number of gold deposits with a Mineral Resource Estimate (MRE) of 1.612Moz Au (62.9Mt at 0.8g/t Au) and 3.07Moz Ag (34.5Mt at 2.8g/t Ag) – refer ASX: BGD, 30/6/25.
  • Located along the Yarlbrinda Shear Zone, a crustal-scale deformation zone within the Gawler Craton which also hosts the Tunkillia deposits.
  • Hosts a number of advanced gold prospects requiring follow-up work, including Sheoak, Bimba and Myall.